I don't understand the base output, for instance when I look under resources I see that I have a:
Base income (20)
Metal mine lvl 14 (1313)
Beginner starter kit (1313)
Geologist lvl 3 (393)
Award 1k stat points (52) all this equals 3091.
But when I look at the description of the metal mine it says income per hour 3091, so why is it showing 1313 for a lvl 14 metal mine under resources, shouldn't it be showing 3091?